Meterial: Plastic
Installation instructions
Step 1: Fix the nails on the wall (for most kinds of walls, such as concrete wall, brick wall, wood wall, just use the nails coming with the plant wall for free).
Recommended Horizontal Spacing between two nails: 40 cm (16 Inches)
Step 2: Unroll the plant wall, and find which one is on the top in the vertical direction if you have two rolls, rotate the plant wall if necessary. In default, if the height of your plant wall is 1 meter, you will get one roll; if the height of the wall is 2 meters, you will get 2 rolls, and so on.
![]() |
![]() |
![]() |
Step 3: Tie the zip-ties (coming with the wall) to the top of the plant wall, then hang it onto the nails on the wall you fixed as described in step 1.
Note: As soon as you hang it on the wall, the plants will stand up automatically.
![]() |
![]() |
Step 4: you should spend a few minutes to expand the leaves with your hands, but this is not a heavy work. Actually it is an enjoyable work!
Due to the reason for camera state when it shoots the images and the differences between computer monitors, there is a slightly difference between photos and products.